Infrastructure Facilities
●
Power supply: Total installed capacity of power generation in Jining
reaches 8.1 million KW with annual output of 34.5 billion KW/H. There
are currently one transformer substation of 220 KV and 5 transformer
substations of 110 KV.
●
Water supply: Locating on one of the three most abundant reserving areas
of underground water of Shandong, the development zone has two water
supply stations of 100,000 t/d and one of 200,000 t/d, drawing water
from deep underground layer.
●
Gas supply: Rate of gas supply accounts for 100%, calorific value over
9000 kilocalorie.
●
Stream supply: Centralized steam suppy system is available. Three
existing thermoelectric plants with installed capacity of 220,000 KW can
provide 320 tons of stream per hour.
●
Waste water disposal: Waste water and rain water are drained
differently. All waste water is collected and treated by an existing
waste water disposal plant with daily capacity of 60,000 tons.
●
Telecommunication: All means of telecommunication are available here,
including IDD, mobile phone globally roaming, wireless paging, TV and
phone conference between major both world and domestic cities, fax, and
internet services such as ISDN, LAN, ADSL and DDN.
●
Post service: Express mail is available by both domestic and world
express service companies.
●
Control of fire and disaster: Institutes and equipment are available to
treat disasters caused by chemical or electric industry. Precise safety
surveillance and alarm system have been set up to cover whole area of
the development zone.
|
|
|